Hyd: Opening of Chandrayanagutta flyover by KTR postponed
The Greater Hyderabad Municipal Corporation (GHMC) built the four-lane bi-directional flyover under the SRDP at a cost of Rs 45.79 crore. The length of flyover extended from 400 metres to 1.07 km for smooth flow of traffic in the old city.
The flyover will beneficial to commuters travelling towards Nalgonda and Warangal through LB Nagar crossroads from Rajiv Gandhi International Airport at Shamshabad. It will also put an end to traffic woes at the Chandrayangutta Junction.